TRAILSENDR
Intermediate

Slaughter Pen

Flow trail perfection: berms, jumps, and machine-built singletrack minutes from downtown.

—
Distance
—
Descent
~2HR
Ride time
No shuttle neededPedal accessibleTrail · XC

Trail beta

Multiple trailheads: most central is the All-American trailhead at Crystal Bridges / Compton Gardens on Main St, or Bark Park lot on N Walton Blvd for the north end. Trails sprawl across pockets connected by the paved Greenway, so download Trailforks and return to pavement when you get turned around. Start with All-American (flowy intro, optional features throughout) and warm up at the Skills Park in the middle. Ride early or late. This is Bentonville's downtown system and it gets crowded with e-bikes and kids after 4pm.

When to go

Rideable year-round thanks to Northwest Arkansas's mild climate and Slaughter Pen's well-drained, rock-armored trail surfaces. Managed by the City of Bentonville. Fall (September-October) is the most popular season for color and cool temps, but winter rides are very common on dry days. Wet-weather closures occasionally happen after heavy rain. Check OZ Trails or NWA Trails before heading out.